Faltese Impact Site (Triangles)

The Second Install Attempt

Photos illustrating the various phases of the final installation process.

Bulldozing the impression for the Impact Crater.



Distributing the first loads of stones around the perimeter of the Impact Crater.



Bringing in more stones to build up the Impact Crater.



Building up the outer perimeter of the Impact Crater with the finer red gravel.



Mold for the Chej-Asos Triangle ready for pouring.



Molds for the 6 Lines of Verdo being poured.



Putting the finishing touches on the mounting of the plaque in the Chej-Asos Triangle.